By Order

One of the necessary equipment in the production of bakery products is the dough rolling equipment. In addition to the dough, this equipment is also able to round the kurt. The equipment is capable of processing 100 kg to 200 kg of product per hour. The diameter of the kurt is from 1 cm to 7 cm. The weight of the dough ranges from 80 grams to 300 grams. Equipment power 2.025 kW, weight 210 kg, dimensions: length 2700 mm, width 470 mm and height 1150 mm.
| Basic parameters | ||
![]() |
Capacity | 100-250 kg/hour |
| Voltage.................................................................................... | 220/380V.............................................................................................. | |
| Kurt diameter | 1-7 cm | |
| Dough ball weight | 80, 120, 250, 300 gramm | |
| Power | 2.025 kW | |
| Machine size | 2700*470*1150 mm | |
| Weight | 210 kg | |
By Order

One of the necessary equipment in the production of bakery products is the dough rolling equipment. In addition to the dough, this equipment is also able to round the kurt. The equipment is capable of processing 100 kg to 200 kg of product per hour. The diameter of the kurt is from 1 cm to 7 cm. The weight of the dough ranges from 80 grams to 300 grams. Equipment power 2.025 kW, weight 210 kg, dimensions: length 2700 mm, width 470 mm and height 1150 mm.
| Basic parameters | ||
![]() |
Capacity | 100-250 kg/hour |
| Voltage.................................................................................... | 220/380V.............................................................................................. | |
| Kurt diameter | 1-7 cm | |
| Dough ball weight | 80, 120, 250, 300 gramm | |
| Power | 2.025 kW | |
| Machine size | 2700*470*1150 mm | |
| Weight | 210 kg | |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer

Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer