


By Order



As construction expands, so does the demand for the materials it needs. Construction products are also divided into different groups. One of them is the door, window and furniture inside the house. This US-HG-2500A equipment serves to cover the upper part of the door with a silicone membrane. The total power of the equipment is 60 kW. The size of the desktop is 2580*1280 mm. The total weight of the equipment is 13 tons.
| Basic parameters | ||||
| Model | US-HG-2500A | |||
| Worktable size | 2580*1280 mm | |||
| Total power | 60 kW | |||
| Positive pressure | 0.4-0.6 Mpa | |||
| Negative pressure | -0.095 Mpa | |||
| Cylinder diameter & quantity | ⌀180 mm * 6 | |||
| Control system | PLC (touch screen) | |||
| Weight | 13000 kg | |||
| Machine parts | ||||
| Main part | Controlling panel | Worktable | ||
![]() |
![]() |
![]() |
||
| Motor | ||||
![]() |
![]() |
![]() |
||
By Order



As construction expands, so does the demand for the materials it needs. Construction products are also divided into different groups. One of them is the door, window and furniture inside the house. This US-HG-2500A equipment serves to cover the upper part of the door with a silicone membrane. The total power of the equipment is 60 kW. The size of the desktop is 2580*1280 mm. The total weight of the equipment is 13 tons.
| Basic parameters | ||||
| Model | US-HG-2500A | |||
| Worktable size | 2580*1280 mm | |||
| Total power | 60 kW | |||
| Positive pressure | 0.4-0.6 Mpa | |||
| Negative pressure | -0.095 Mpa | |||
| Cylinder diameter & quantity | ⌀180 mm * 6 | |||
| Control system | PLC (touch screen) | |||
| Weight | 13000 kg | |||
| Machine parts | ||||
| Main part | Controlling panel | Worktable | ||
![]() |
![]() |
![]() |
||
| Motor | ||||
![]() |
![]() |
![]() |
||
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer