
By Order

| Model | US-AOP-VS30 | Filtration | ≤3 micron |
| Rated pressure (Mpa) | ≤0.3 | Heating power | 21KW |
| Vacuum pressure (Mpa) | -0.06~-0.099 | Total power | 23KW |
| Water content (ppm) | ≤50 | Gas content of oil % | ≤0.1 |
| Voltage | 380V 3 phase |
| Features | ● Dehydration ● Degassing ● Remove mechanical impurities in parallel with the regeneration device ● Increase the insulation strength |
| Three System | ●Vacuum system ● Filtering system ● Heating system |
| Filtration Accuracy | ●Pump filter: 100um ●Primary filter: 10、 20、 40um ●Secondary filter: 3、5、10um |

By Order

| Model | US-AOP-VS30 | Filtration | ≤3 micron |
| Rated pressure (Mpa) | ≤0.3 | Heating power | 21KW |
| Vacuum pressure (Mpa) | -0.06~-0.099 | Total power | 23KW |
| Water content (ppm) | ≤50 | Gas content of oil % | ≤0.1 |
| Voltage | 380V 3 phase |
| Features | ● Dehydration ● Degassing ● Remove mechanical impurities in parallel with the regeneration device ● Increase the insulation strength |
| Three System | ●Vacuum system ● Filtering system ● Heating system |
| Filtration Accuracy | ●Pump filter: 100um ●Primary filter: 10、 20、 40um ●Secondary filter: 3、5、10um |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer