As the cities develop, the demands for technologies in them will also increase. To take the car of this model to the upper floor, the elevator has a capacity of 5000kg and the platform has a size of 7000*4500mm. The exit height of the 380V elevator is 10.53m, and the speed is 8-10m/min.
| Basic parameters | ||
| Model | US-C-KHS5.0-10.59 | ![]() |
| Load capacity | 5000kg | |
| Travel height | 10.53m | |
| Flow/stops | 4/4.............................................................................................................................. | |
| Platform size | 7000*4500mm | |
| Lifting speed | 8-10m/min | |
| Drive | hydaulic | |
| Power input | 380V/50Hz/3 phase | |
| Control voltage | 24V | |
| Some parts of the lift | ||
| Laser cutting integrated bending post | Antiskid platform | Double chains transmission |
![]() |
![]() |
![]() |
| Tensile cylinder | Caution light | Infrared photoelectric sensor |
![]() |
![]() |
![]() |
By Order

As the cities develop, the demands for technologies in them will also increase. To take the car of this model to the upper floor, the elevator has a capacity of 5000kg and the platform has a size of 7000*4500mm. The exit height of the 380V elevator is 10.53m, and the speed is 8-10m/min.
| Basic parameters | ||
| Model | US-C-KHS5.0-10.59 | ![]() |
| Load capacity | 5000kg | |
| Travel height | 10.53m | |
| Flow/stops | 4/4.............................................................................................................................. | |
| Platform size | 7000*4500mm | |
| Lifting speed | 8-10m/min | |
| Drive | hydaulic | |
| Power input | 380V/50Hz/3 phase | |
| Control voltage | 24V | |
| Some parts of the lift | ||
| Laser cutting integrated bending post | Antiskid platform | Double chains transmission |
![]() |
![]() |
![]() |
| Tensile cylinder | Caution light | Infrared photoelectric sensor |
![]() |
![]() |
![]() |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer