By Order

The difference of this equipment from others is its speed of operation and, as the name suggests, it produces 4 bags at once and their volume is up to 1.5L. The difference of the US-LGB-4-15L model equipment from others is the production speed, i.e. 3500-4000 bags per hour.

| Basic parameters | |
| Theoritical output | 3600-4000 dona/soat |
| Max. container volume | 1.5L |
| Max. neck diameter | 45mm |
| Max. container diameter | 100mm |
| Max. container height | 330mm |
| Mould thickness | 210mm |
| Heat lamp amount | 28ta |
| Max. heating power | 42kw |
| Power of main blower | 43kw |
| Power consumption | 10-15kw |
| Working pressure | 0.8Mpa |
| Low pressure consuming | 2000 L/min |
| Blowing pressure | 3.5 Mpa |
| High pressure consuming | 2100 L/min |
| Measurement of main blower | 3400*2200*1800mm |
| Measurement of elevator | 1800*900*2210mm |
| Weight of main blower | 3200kg |
By Order

The difference of this equipment from others is its speed of operation and, as the name suggests, it produces 4 bags at once and their volume is up to 1.5L. The difference of the US-LGB-4-15L model equipment from others is the production speed, i.e. 3500-4000 bags per hour.

| Basic parameters | |
| Theoritical output | 3600-4000 dona/soat |
| Max. container volume | 1.5L |
| Max. neck diameter | 45mm |
| Max. container diameter | 100mm |
| Max. container height | 330mm |
| Mould thickness | 210mm |
| Heat lamp amount | 28ta |
| Max. heating power | 42kw |
| Power of main blower | 43kw |
| Power consumption | 10-15kw |
| Working pressure | 0.8Mpa |
| Low pressure consuming | 2000 L/min |
| Blowing pressure | 3.5 Mpa |
| High pressure consuming | 2100 L/min |
| Measurement of main blower | 3400*2200*1800mm |
| Measurement of elevator | 1800*900*2210mm |
| Weight of main blower | 3200kg |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer

Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer