By Order

This US-DHJBJ-120-4 model equipment serves to bend the mouth of plastic cups. The equipment has a processing speed of 400-800 glasses per minute and has a main motor of 2.2 kW and a heating motor of 13 kW. The weight of the equipment working at 380V is 1 ton.
| Basic parameters | |
| Model | US-DHJBJ-120-4 |
| Working speed | 400-800 pcs/min |
| Main motor | 2.2 kW |
| Feeding motor | 0.09 kW |
| Heating power | 13 kW |
| Overall size | 5000*1100*1300 mm |
| Power | 380V, 60 Hz |
| Weight | 1 t |
| Air pressure | 0.6 Mpa |
By Order

This US-DHJBJ-120-4 model equipment serves to bend the mouth of plastic cups. The equipment has a processing speed of 400-800 glasses per minute and has a main motor of 2.2 kW and a heating motor of 13 kW. The weight of the equipment working at 380V is 1 ton.
| Basic parameters | |
| Model | US-DHJBJ-120-4 |
| Working speed | 400-800 pcs/min |
| Main motor | 2.2 kW |
| Feeding motor | 0.09 kW |
| Heating power | 13 kW |
| Overall size | 5000*1100*1300 mm |
| Power | 380V, 60 Hz |
| Weight | 1 t |
| Air pressure | 0.6 Mpa |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer

Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer