By Order

Such equipment is used for the production of T-shirt-shaped bags. US-XY-400*2 model equipment produces plastic bags 660 mm long and 360 mm*2 wide. The total power of the equipment is 8 kW and its weight is 2000 kg. In the description below, there are other models of this equipment, and their prices differ from each other.
| Basic parameters | |||
| Model | US-XY-400*2 | US-XY-450*2 | US-XY-500*2 |
| Max. bag-making width | 360 mm*2 | 410 mm*2 | 450 mm*2 |
| Producing length | 660 mm | 680 mm | 750 mm |
| Producing length | 100*240* 2 circle/min | ||
| Thickness of film | 0.008-0.35 mm | ||
| Main motor | 1.5 kW | ||
| Main power | 8 kW | 10 kW | 12 kW |
| Air pressure | 7 kg/cm2; 700 Ni/min | ||
| Weight | 2000 kg | 2100 kg | 2200 kg |
| Dimension | 7.0 * 1.6 * 1.7 m | 7.0 * 1.7 * 1.7 m | 7.0 * 1.8 * 1.7 m |
By Order

Such equipment is used for the production of T-shirt-shaped bags. US-XY-400*2 model equipment produces plastic bags 660 mm long and 360 mm*2 wide. The total power of the equipment is 8 kW and its weight is 2000 kg. In the description below, there are other models of this equipment, and their prices differ from each other.
| Basic parameters | |||
| Model | US-XY-400*2 | US-XY-450*2 | US-XY-500*2 |
| Max. bag-making width | 360 mm*2 | 410 mm*2 | 450 mm*2 |
| Producing length | 660 mm | 680 mm | 750 mm |
| Producing length | 100*240* 2 circle/min | ||
| Thickness of film | 0.008-0.35 mm | ||
| Main motor | 1.5 kW | ||
| Main power | 8 kW | 10 kW | 12 kW |
| Air pressure | 7 kg/cm2; 700 Ni/min | ||
| Weight | 2000 kg | 2100 kg | 2200 kg |
| Dimension | 7.0 * 1.6 * 1.7 m | 7.0 * 1.7 * 1.7 m | 7.0 * 1.8 * 1.7 m |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer

Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer