By Order


This US-XYLTD-800 equipment for the production of bags from polyethylene bubble film has a capacity of 22 kW. It has a production capacity of 60 to 200 products per minute, depending on the type of package. The equipment works at 380V 3-phase voltage and the total size is 13 * 3.5 * 3.3 m.

| Basic parameters | |
| Model | US-XYLTD-800 |
| Suitable material | Air bubble film (25-150g), tape |
| Material requirements | PE laminating fim, aluminium foil |
| Max. feeding diameter | bubble film ⌀ 1500mm |
| Max. feeding width | bubble film ≤ 1500mm |
| Max. bag length |
≤ 650mm (box bottom bag including the tounge of bag) ≤ 600mm (envelope bag including the tounge of bag) |
| Max. bag width | ≤ 800mm |
| Speed of bag making |
60-140 pcs/min (box bottom bag) 80-200 pcs/min (envelope bag) |
| Total power | 22 kW |
| Voltage | 380V, 3 phase |
| Dimension | 13 * 3.5 * 3.3 m |
By Order


This US-XYLTD-800 equipment for the production of bags from polyethylene bubble film has a capacity of 22 kW. It has a production capacity of 60 to 200 products per minute, depending on the type of package. The equipment works at 380V 3-phase voltage and the total size is 13 * 3.5 * 3.3 m.

| Basic parameters | |
| Model | US-XYLTD-800 |
| Suitable material | Air bubble film (25-150g), tape |
| Material requirements | PE laminating fim, aluminium foil |
| Max. feeding diameter | bubble film ⌀ 1500mm |
| Max. feeding width | bubble film ≤ 1500mm |
| Max. bag length |
≤ 650mm (box bottom bag including the tounge of bag) ≤ 600mm (envelope bag including the tounge of bag) |
| Max. bag width | ≤ 800mm |
| Speed of bag making |
60-140 pcs/min (box bottom bag) 80-200 pcs/min (envelope bag) |
| Total power | 22 kW |
| Voltage | 380V, 3 phase |
| Dimension | 13 * 3.5 * 3.3 m |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer


Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer