By Order

This US-LGD-2-15 equipment serves for the production of plastic bottles. The production speed of the equipment is 1800-2400 pieces per hour and produces plastic bottles of 0.3, 0.5, 1 and up to 1.5L. Regarding some parameters of the equipment, the maximum heating power is 42kw, the main compressor power is 43kw, and the power consumption is 10-15kw.

| Basic parameters | |
| Number of cavity | 2 |
| Theoritical output | 1800-2400pcs/hour |
| Max. container volume | 1.5L |
| Max. neck diameter | 45mm |
| Max. container diameter | 100mm |
| Max. container height | 330mm |
| Mould thickness | 210mm |
| Heat lamp amount | 28 |
| Max. heating power | 42KW |
| Power of main blower | 43KW |
| Actual power consumption | 10-15KW |
| Working pressure | 0.8Mpa |
| Low pressure consuming | 2000 ltr/min |
| Blowing pressure | ≤3.5 |
| High pressure consuming | 1200ltr/min |
| Measurement of main blower | 2700*1600*1800mm |
| Measurement of elevator | 1800*900*2240mm |
| Weight of main blower | 2200kg |
By Order

This US-LGD-2-15 equipment serves for the production of plastic bottles. The production speed of the equipment is 1800-2400 pieces per hour and produces plastic bottles of 0.3, 0.5, 1 and up to 1.5L. Regarding some parameters of the equipment, the maximum heating power is 42kw, the main compressor power is 43kw, and the power consumption is 10-15kw.

| Basic parameters | |
| Number of cavity | 2 |
| Theoritical output | 1800-2400pcs/hour |
| Max. container volume | 1.5L |
| Max. neck diameter | 45mm |
| Max. container diameter | 100mm |
| Max. container height | 330mm |
| Mould thickness | 210mm |
| Heat lamp amount | 28 |
| Max. heating power | 42KW |
| Power of main blower | 43KW |
| Actual power consumption | 10-15KW |
| Working pressure | 0.8Mpa |
| Low pressure consuming | 2000 ltr/min |
| Blowing pressure | ≤3.5 |
| High pressure consuming | 1200ltr/min |
| Measurement of main blower | 2700*1600*1800mm |
| Measurement of elevator | 1800*900*2240mm |
| Weight of main blower | 2200kg |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer

Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer