
By Order

This US-XYWX-300*2 is a coreless machine and has a production capacity of 80-100m/min*2 line speed. The weight of the equipment is 2800 kg, the total power is 12 kW and the size is 6.5 * 2.3 * 1.5 m. The length of the produced packages is 200-900 mm, and the width is 80-150 mm.
| Basic parameters | |
| Model | US-XYWX-300*2 |
| Width of bag roll | 80-150 mm |
| Length of bags | 200-900 mm |
| Max. diameter of rewind roll | ⌀ 150 mm |
| Max. diameter of unwind roll | ⌀ 900 mm |
| Thickness film | 6-25 micron (per layer) |
| Bag making speed max. | 80-100 m/min*2 layers |
| Air compressor | 5 hp |
| Total power | 12 kW |
| Weight | 2800 kg |
| Dimension | 6.5 * 2.3 * 1.5 m |
By Order

This US-XYWX-300*2 is a coreless machine and has a production capacity of 80-100m/min*2 line speed. The weight of the equipment is 2800 kg, the total power is 12 kW and the size is 6.5 * 2.3 * 1.5 m. The length of the produced packages is 200-900 mm, and the width is 80-150 mm.
| Basic parameters | |
| Model | US-XYWX-300*2 |
| Width of bag roll | 80-150 mm |
| Length of bags | 200-900 mm |
| Max. diameter of rewind roll | ⌀ 150 mm |
| Max. diameter of unwind roll | ⌀ 900 mm |
| Thickness film | 6-25 micron (per layer) |
| Bag making speed max. | 80-100 m/min*2 layers |
| Air compressor | 5 hp |
| Total power | 12 kW |
| Weight | 2800 kg |
| Dimension | 6.5 * 2.3 * 1.5 m |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer