By Order


This US-DP-FP-3200A equipment performs the task of high-speed welding of steel wires with a thickness of 2.5 mm to 6 mm. The minimum width between the grid cells is 12.7 mm, the maximum height/width of the grid is 3.2 m and the length is 6 meters. The weight of the equipment is 5300 kg, the length is 5.4 m, the width is 3.7 m and the height is 2.3 m.
| Basic parameters | |||
![]() |
Model | US-DP-FP-3200A | ![]() |
| Wire diameter......................................................................... | 2.5-6 mm........................................................................................... | ||
| Langitude wire space | 76.2-300 mm | ||
| Cross wire space (mini) | 12.7 mm | ||
| Mesh width/height | 3.2 m | ||
| Mesh length (maks) | 6 m | ||
| Welding speed | 60-103 times/min | ||
| Welding electrodes | 44 | ||
| Welding transformers | 150 kva*11 pcs | ||
| Dimension | 5.4 * 3.7 * 2.3 m | ||
| Weight | 5300 kg | ||
By Order


This US-DP-FP-3200A equipment performs the task of high-speed welding of steel wires with a thickness of 2.5 mm to 6 mm. The minimum width between the grid cells is 12.7 mm, the maximum height/width of the grid is 3.2 m and the length is 6 meters. The weight of the equipment is 5300 kg, the length is 5.4 m, the width is 3.7 m and the height is 2.3 m.
| Basic parameters | |||
![]() |
Model | US-DP-FP-3200A | ![]() |
| Wire diameter......................................................................... | 2.5-6 mm........................................................................................... | ||
| Langitude wire space | 76.2-300 mm | ||
| Cross wire space (mini) | 12.7 mm | ||
| Mesh width/height | 3.2 m | ||
| Mesh length (maks) | 6 m | ||
| Welding speed | 60-103 times/min | ||
| Welding electrodes | 44 | ||
| Welding transformers | 150 kva*11 pcs | ||
| Dimension | 5.4 * 3.7 * 2.3 m | ||
| Weight | 5300 kg | ||
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer


Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer