By Order


This US-DP-2000 equipment serves for the production of metal fibers. The equipment has a production capacity of 5000 kg to 7000 kg of product in 8 hours. The thickness of the used wire is 0.3-1 mm, the power of the equipment is 3 kW, and the length of the finished product is up to 60 mm. The equipment weighing 1200 kg is 1 m long, 0.72 m wide and 1.5 m high.
| Basic parameters | |||
![]() ![]() |
Model | US-DP-2000 | US-DP-900 |
| Productivity................................................ | 5000-7000 kg / 8hour..................................................... | 900 kg / 8hour............................................................... | |
| Wire diameter | 0.3-1 mm | 0.2-1 mm | |
| Max. length | 60 mm | 60 mm | |
| Motor power | 3 kW | 5.5+0.15 kW | |
| Machine dimension | 1*0.72*1.5 m | 0.6*0.85*0.95 m | |
| Weight | 1200 kg | 700 kg | |
By Order


This US-DP-2000 equipment serves for the production of metal fibers. The equipment has a production capacity of 5000 kg to 7000 kg of product in 8 hours. The thickness of the used wire is 0.3-1 mm, the power of the equipment is 3 kW, and the length of the finished product is up to 60 mm. The equipment weighing 1200 kg is 1 m long, 0.72 m wide and 1.5 m high.
| Basic parameters | |||
![]() ![]() |
Model | US-DP-2000 | US-DP-900 |
| Productivity................................................ | 5000-7000 kg / 8hour..................................................... | 900 kg / 8hour............................................................... | |
| Wire diameter | 0.3-1 mm | 0.2-1 mm | |
| Max. length | 60 mm | 60 mm | |
| Motor power | 3 kW | 5.5+0.15 kW | |
| Machine dimension | 1*0.72*1.5 m | 0.6*0.85*0.95 m | |
| Weight | 1200 kg | 700 kg | |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer


Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer